VCS3506BI / VCS5006BI Assembly
Step 6: Assemble the Grill Unit to the Enclosure
Note: This step should be performed by two (2) persons wearing gloves.
Before positioning the Grill Unit into the prepared enclosure or insulated jacket, depending on available access, it may be necessary to temporarily disconnect the LP regulator or 12 ft. Natural Gas Hose from the Steel Flex Line.
Carefully position the Grill Unit into the opening from the front and raised slightly, while ensuring the gas feed tubing is fed through the hole provided in the bottom of the enclosure opening. Push the unit back into its final position and check for proper fit.
Next: Reattach the LP Regulator or hose if it was removed and check all connections for leaks. Reinsert the Grease Tray into its place.
Caution: The end of the Steel Flex Line should be clamped to the surrounding structure to prevent excessive movement.
Caution: Do not turn on the grill until after performing a leak check at all connection points and fittings. Use a spray solution of 50% dish soap and 50% water onto all connection points and fittings. Formation of bubbles indicates air leaks.
Fig. 6
Page 6