DeLonghi DEGESC24SS Injectors Table, Operations to be Performed When Substituting the Injectors

Page 15

INJECTORS TABLE

 

NOMINAL

REDUCED

LP/PROPANE

NATURAL GAS

 

POWER

POWER

11” W.C.P.

4” W.C.P.

BURNERS

BTU/hr

BTU/hr

Ø injector

By-pass

Ø injector

By-pass

[1/100 mm]

[1/100 mm]

[1/100 mm]

[1/100 mm]

 

 

 

 

 

 

 

 

 

 

Auxiliary (AUX)

3500

1000

55

27

90

adjustable

 

 

 

 

 

 

 

Semirapid (SR)

6000

1500

72

32

118

adjustable

 

 

 

 

 

 

 

Triple ring (TC)

12000

5000

102

65

170

adjustable

 

 

 

 

 

 

 

OPERATIONS TO BE PERFORMED WHEN SUBSTITUTING THE INJECTORS

Remove the gratings, the burner covers and the knobs;

Using a wrench substitute the nozzle injectors “J” (figs. 2.11 - 2.12) with those most suitable for the kind of gas for which it is to be used.

The burner are conceived in such a way so as not to require the regulation of the primary air.

J

Fig. 2.11

J

Fig. 2.12

SETTING THE BURNER MINIMUM

 

When switching from one type of gas to another, the minimum flow rate must also be

F

correct: the flame should not go out even when passing suddenly from maximum to

 

minimum flame.

 

 

To regulate the flame follow the instructions below:

 

Light the burner

 

 

Set the gas valve to

position

 

– Remove the knob

 

 

– With a thin screwdriver pass by the hole of microswitch and turn the screw F until

 

 

adjustment is correct (fig. 2.13).

 

Fig. 2.13

For LP/PROPANE gas, tighten the adjustment screws completely.

15

Image 15
Contents GAS/ELECTRIC Range ALL Ranges can TIP Data Plate Conversion Label Installation Instructions Air Supply and Ventilation Replacement PartsElectrical Grounding Instructions Electrical RequirementGAS and Electric Connection Proximity to Side CabinetsAssembling the Backguard It is mandatory to install the backguardLevelling the Range ANTI-TIP Stability Device Installation InstructionsManual Shut-off Valve fig Explosion HazardPressure Regulator Pressure Regulator Installation Step GAS Connection Specification ExtensionPressure regulator Leak Testing Flexible ConnectionsRigid Pipe Connections Setting the Pressure Regulator fig Conversion to LP/PROPANE GASTo remove the warming drawer Fitting the warming drawer fig To set the pressure regulator figOperations to be Performed When Substituting the Injectors Setting the Burner MinimumInjectors Table Electrical Connection with Power Cord Electrical RequirementsElectrical Connection with Conduit Wire Power Cord Installation using Strain Relief Supplied Wire Power Cord Installation Wire Conduit Installation Energy Regulator Wiring DiagramPage Page Page Cod ß4