Verona VEFSGE 304 SC manual Installation Instructions

Page 4

INSTALLATION INSTRUCTIONS

WARNING!

THIS APPLIANCE MUST BE INSTALLED BY A QUALIFIED INSTALLER.

Improper installation, adjustment, alteration, services, or maintenance can cause injury or property damage. Consult a quali- fied installer, service agent, or the gas supplier.

IMPORTANT: The use of suitable protective clothing/gloves is recommended when handling, installing of this appliance.

TOOLS NEEDED FOR INSTALLATION (NOT SUPPLIED WITH THE APPLIANCE)

Screwdriver

2 - Wrench

T-handle wrench

Pencil

Tape measure

Suitable protective gloves

Hammer

Adjustable wrench

Adjustable pliers

Drill

4

Image 4
Contents GAS/ELECTRIC Range What to do if YOU Smell GAS Data Plate Conversion Label Installation Instructions Replacement Parts Electrical Grounding InstructionsInstallation Proximity to Side CabinetsIt is mandatory to install the backguard Assembling the BackguardProximity to Side Cabinets Standard Installation Proximity to Side Cabinets Island Installation ANTI-TIP Stability Device Installation Instructions Levelling the RangeInstalling the Cooktop Front Guard Pressure Regulator Manual Shut-off Valve figExplosion Hazard Pressure Regulator Installation Step GAS Connection Speficication Flexible Connections Leak TestingRigid Pipe Connections Setting the Pressure Regulator To set the pressure regulator figOperations to be Performed When Substituting the Injectors Injectors TableSetting the Burner Minimum Semirapid burnerElectrical Requirements Electrical Connection with Power CordElectrical Connection with Conduit Wire Power Cord Installation See Figure =1 9/64 29 mm =7/8 22.5 mm Power CordWire Conduit Installation See Figure Plug the terminal holes of conductorsWiring Diagram Electric Diagram KEY