Moyer Diebel MH-6LM3, MH-6NM3, MH-60M3 technical manual Installation, Unpack the dishwasher

Page 10

INSTALLATION

INSTALLATION

Unpack the dishwasher

CAUTION:

! Care should be taken when lifting the machine to prevent damage.

NOTE:

The installation of your machine must meet all applicable health and safety codes.

1.Immediately after unpacking the machine, inspect for any shipping damage. If damage is found, save the packing material and contact the carrier immediately.

2.Remove the dishwasher from the skid. Move the machine to its permanent location.

NOTE:

Refer to: To change from Straight-through Operation to Corner Operation on the next page if your machine will be placed for corner operation.

3.Level the machine (if required) by placing a level on the top of the machine and adjusting the feet. Level the machine front-to-back and side-to-side.

4.Remove the dishracks from the interior of the machine.

5.Refer to Fig. 1. Remove (2) screws that hold the front panel. Remove the front panel in preparation for service connections.

POWER

FILL

 

 

CYCLE

 

 

EXTENDED WASH

 

WASH

RINSE

WARNING!

 

 

 

 

TURN OFF POWER BEFORE

 

 

SERVICING MACHINE

Figure 1

Remove Front Panel

8

Image 10
Contents MH-6NM3 MH-6LM3Moyer Diebel, US Moyer Diebel, Limited Revision History CommentsContents List of Figures Limited Warranty Introduction Welcome to Moyer DiebelStandard Equipment includes AccessoriesOptions MH-60 only Model Installation Unpack the dishwasherPlacement for Corner Operation Installation Electrical ConnectionsHinged Control Panel Installation 20-22 PSI/138-151.8 kPaDrain Connections Water ConnectionsVentilation Chemical Dispenser Signal Terminal Block Chemical ConnectionsMH-6L Only MH-60, 6NMH-60, 6N, 6L Models MH-60 and MH-6N do not require sanitizerComplete the installation Initial START-UPCheck Wash Water Temperature Initial START-UPPower Check Final Rinse Water Temperature Check Final Rinse Water PressureComplete the initial start-up Extended Wash OperationDrain the dishwasher Initial START-UP Operation Summary Action ResultEvery 2 Hours or After Each Meal Period CleaningEvery 8 Hours or at the End of the Day Deliming Troubleshooting Condition Cause SolutionTroubleshooting Schematics Basic ServiceTroubleshooting ToolsElectrical Service Motor OverloadsElectrical Service Timers Cycle TimerConfiguration a Electrical Service Motor Connections LineMechanical Service Pump Seal ReplacementReplacement Parts MH-60/6N/6L Doors and Panels Doors and Panels Part Item No Part DescriptionMH-60/6N/6L Door Guides, Stops, and Lift Bracket Door GUIDES, STOPS, and Lift Bracket Part Item No Part Description QtyMH-60/6N/6L Door Handle, Spring Assembly, and Safety Switch Door HANDLE, Spring ASSEMBLY, and Safety Switch BUSHING, Side DoorMH-60/6N/6L Track Assembly Corner configuration shown Track Assembly GUIDE, Left HandFront Side Left WASH/RINSE Spray Piping MH-60/6N/6L Wash/Rinse Spray Arms WASH/RINSE Spray Arms MH-60/6N/6L Drain Assembly and Scrap Screens Drain Assembly and Scrap Screens RETAINER, OverflowMH-60/6N/6L Wash Tank Heat and Thermostats Wash Tank Heat and Thermostats WASHER, Lock 1/4 Split SSTValve Fill From Piping MH-60 only Electric Booster and Thermostats WASHER, Lock 1/4 SplitTo Upper MH-60 only Lower Fill Piping Assembly Replacement Parts Water in from Lower Piping MH-60/6N only Upper Fill Piping Assembly Customer Water MH-6N/6L only Lower Fill Piping Assembly MH-6L Only Upper Fill Piping Assembly MH-6L only Upper Fill Piping Assembly MH-60/6N/6L Pump Assembly Pump Assembly Backing PLATE, MachinedMH-60/6N/6L Control Panel and Gauges Control Panel and Gauges MH-60/6N/6L Control Cabinet Control Cabinet Dishracks and PRV Dishracks and PRV Part Part Description Item NoThis Intentionally Left Blank Electrical Schematic / 3 Phase MH-60, 6N, 6L Electrical Schematic / 1 Phase MH-60, 6N, 6L