Brown and Son WA Cooler & Freezer manual Top Panel Trim Installation

Page 13

Top Panel Trim Installation

Installation of 1/2" x 5" Trim on Top Panels

Trim is used to finish off all Walk-In Cooler and Freezers other than Drop-Off units and is left to the installer, as not all field conditions are identical. Trim is packed with each shipment (as required) from W. A. Brown.

Install corner trim pieces first. Use four #6 self tapping screws supplied (See Figure 13-1). Install trim metal between corners. Overlap all joints by 1/2". Use one screw every 2' (See Figure 13-2). Caulk bottom of trim as needed. An inverted corner will not use corner trim pieces. Full length pieces are to be butted together in the corner (See Figure 13-3)

Figure #13-1

Figure #13-2

Figure #13-3

Drop-Off Walk-In Coolers and Freezers

Prior to the arrival of your Drop-Off Walk-In, you are responsible for assuring that the concrete slab is the appro- priate size, thickness and level. Remember that the Drop-Off unit comes on metal runners which will affect the height of the floor.

Upon arrival, visually inspect the Walk-In for dents, scratches and other issues.

Unload the Walk-In and position properly. Finish door and threshold trimming.

Final positioning of the Drop-Off unit is the responsibility of the end user or general contractor.

Make final electrical connections in accordance to prevailing codes and start the cool down process.

Warning! The electricity should not be turned on any door with a heater until the refrigeration system has been activated, as a failed heater wire may result. Do not operate Light with globe unless unit is cooled down. Maximum bulb size is 100 watts

11

Image 13
Contents For All W. A. Brown & Son, Inc. Models Table of Contents Terminology Receiving and UncratingInstallation of floor panels Floor Preparation and InstallationDiamond Aluminum Treadplate Overlay Instructions Layout of the FloorFloor Spline Layout and Installation Cam Lock InstallationFloorless Walk-In Layout Ramset Studs Or ScrewsFigure #4 PVC Panel Track Installation for Floorless Walk-InWall Protector Plate Wainscotting Instructions Wall Panel InstallationMultiple Compartment Walk-Ins With a Tee Panel Top Panel InstallationMembrane Roof Cap Installation of Membrane Roof Cap For Outside UnitsPenetrations of Panels Install to existing wall Duro-LastRoof Cap Installation for outside installationPainting Fiber Cement Fiber Cement Finish Panels InstallationWhen ceiling is not Installation of 1/2 x 5 Trim on Top Panels Top Panel Trim InstallationDrop-Off Walk-In Coolers and Freezers Installing the Refrigeration System EZ Pack Installation InstructionsSetting Controls Final Checks Before OperationWiring the Door Heater, Lights & Windows Roof Cap & Curb Installation Figure #14Vapor Proof Light Fluorescent LightsHousekeeping and Safety Recommendations Housekeeping and SafetyCleaning of Stucco Aluminum & Galvalume Plus Cleaning Stainless Steel FinishesReplacement Parts How To Call for Service RepairSize Lifetime Limited Cabinet Warranty Instructions for removing Door Leaf with Spring Adjusting Door Closer See Figure #17Loaded Hinges See Figure #15 See sketchDescription Of Numbered Door Section Components Replacement KeysDescription Of Numbered Parts in Figure #19 and #20 Guidelines For Replacing Door Heater CableCross Section Of Door Leaf Relacing Door GasketDescription Of Numbered Parts in Figure #21 Replacing Flush Dial Thermometer Installing Surface Dial Thermometer Figure #23Replacing a Pressure Relief Port Replacing The Digital ThermometerDescription Of Numbered Parts, Figure #24 and #25 Description Of Numbered Parts, Figure #27, and #28Figure #26 Electrical Hook-Up to Junction BoxFigure #30 Malfunction Possible Cause Solution Refrigeration Trouble Shooting GuideInput Voltage