Brown and Son WA Cooler & Freezer manual Description Of Numbered Door Section Components

Page 20

Description Of Numbered Door Section Components

1.Vapor Proof Light (use standard light bulb, maximum 100 watts) with plastic coated glass

2.Electrical Junction Box

3.Door Closer

4.Temperature Indicating Device (Dial Shown)

5.Light Switch With Neon Pilot Light

6.Door Latch Assembly

7.Heater Cable

8.Door Hinge

9.Threshold Plate

10.Drag Gasket

11.Floor Panel

All wiring contained within the door section is 115/60/1 with the exception of the digital thermometer when used. The wiring from the low voltage side of the class 2 transformer is 12 volts. Wiring from the line side of the trans- former 115/60/1 phase. Door Sections are UL Approved.

DOOR SECTION CUT AWAY

Figure #18

Replacement Keys

Should replacement keys be required, call our Customer Service Department with your serial number (see page 15) They will be able to provide extra keys at an additional charge.

Warning! Do not leave light on or have heater cable activated for extended periods of time when Walk-in is not in operation.

18

Image 20
Contents For All W. A. Brown & Son, Inc. Models Table of Contents Receiving and Uncrating TerminologyFloor Preparation and Installation Installation of floor panelsDiamond Aluminum Treadplate Overlay Instructions Layout of the FloorCam Lock Installation Floor Spline Layout and InstallationFloorless Walk-In Layout Ramset Studs Or ScrewsPVC Panel Track Installation for Floorless Walk-In Figure #4Wall Panel Installation Wall Protector Plate Wainscotting InstructionsTop Panel Installation Multiple Compartment Walk-Ins With a Tee PanelPenetrations of Panels Installation of Membrane Roof Cap For Outside UnitsMembrane Roof Cap Duro-LastRoof Cap Installation for outside installation Install to existing wallFiber Cement Finish Panels Installation Painting Fiber CementWhen ceiling is not Drop-Off Walk-In Coolers and Freezers Top Panel Trim InstallationInstallation of 1/2 x 5 Trim on Top Panels EZ Pack Installation Instructions Installing the Refrigeration SystemSetting Controls Final Checks Before OperationRoof Cap & Curb Installation Figure #14 Wiring the Door Heater, Lights & WindowsVapor Proof Light Fluorescent LightsHousekeeping and Safety Housekeeping and Safety RecommendationsCleaning of Stucco Aluminum & Galvalume Plus Cleaning Stainless Steel FinishesSize How To Call for Service RepairReplacement Parts Lifetime Limited Cabinet Warranty Adjusting Door Closer See Figure #17 Instructions for removing Door Leaf with SpringLoaded Hinges See Figure #15 See sketchReplacement Keys Description Of Numbered Door Section ComponentsGuidelines For Replacing Door Heater Cable Description Of Numbered Parts in Figure #19 and #20Description Of Numbered Parts in Figure #21 Relacing Door GasketCross Section Of Door Leaf Installing Surface Dial Thermometer Figure #23 Replacing Flush Dial ThermometerReplacing The Digital Thermometer Replacing a Pressure Relief PortDescription Of Numbered Parts, Figure #24 and #25 Description Of Numbered Parts, Figure #27, and #28Electrical Hook-Up to Junction Box Figure #26Figure #30 Refrigeration Trouble Shooting Guide Malfunction Possible Cause SolutionInput Voltage