Brown and Son WA Cooler & Freezer Roof Cap & Curb Installation Figure #14, Vapor Proof Light

Page 15

Roof Cap & Curb Installation (Figure #14)

1.

Make sure Walk-in top is completely clean of

8.

Set refrigeration unit in place.

 

any debris.

9.

Install protruding sleeve of unit into cut out

2.

Run bead of Silicone around cut-out opening.

 

opening of walk-in.

3.

Install 2 piece Wood Curb (provided) onto Walk-

10. Screw unit base handles down with rubber

 

in top with counter sink screws (provided).

 

grommet screws.

4.

Follow procedures for installing Membrane Roof

11.

Install 3/4" PVC drain line with armor flex

 

Cap over Wood curb, page 7.

 

insulation over copper drain line. (Optional)

5.

Cut rubber roof cap over opening in X shape.

12. Install clamps over drain line on side of walk-in.

6.

Roll rubber roof cap inside opening.

13. Run bead of silicone around unit base, rubber

7.

Run bead of Silicone around cut-out opening.

 

grommet screws and drain line.

 

 

 

 

 

 

 

 

 

 

 

 

 

Copper Drain

 

.

.

.

.

 

 

 

 

 

.

 

Line Outlet

 

.

 

 

 

.

 

 

 

 

 

 

.

 

 

 

Cut-Out

 

 

 

.

 

 

 

 

 

 

 

.

 

 

 

 

 

 

 

 

 

.

 

 

 

 

 

 

 

 

 

 

 

..

 

 

 

 

 

 

 

 

 

 

 

 

.

 

 

 

 

 

 

 

 

 

 

 

.

 

 

 

 

 

 

 

Opening

 

 

. .

.

.

.

.

 

Refrig-

 

.

 

 

 

 

.

 

 

 

 

 

 

 

 

.

 

 

 

 

 

 

 

Base

eration

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Unit

 

 

 

 

 

 

 

 

 

 

 

 

Handles

 

 

 

 

 

 

 

 

 

 

 

 

 

2nd Piece

 

 

 

 

 

 

 

 

 

 

 

 

Drain

 

 

 

 

 

 

 

 

 

 

 

 

Line

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Clamps

 

 

 

 

 

 

 

 

 

 

 

 

 

3/4" PVC

Wood Curb

 

 

 

 

 

 

 

 

 

 

 

 

Drain Line

 

 

 

 

 

 

 

 

 

 

 

 

with Armor Flex

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Rubber Roof Cap

 

Figure #14

 

 

 

 

 

 

 

 

 

 

 

 

 

Warning! Never penetrate rubber roof cap, (with exception of rubber grommet unit mounting screws.)

Wiring the Door Heater, Lights & Windows

All freezers and some coolers are shipped with a 120V peripheral heater around the door to eliminate condensate and keep the door frame and jamb from “sweating”. Likewise most freezer windows are also designed with a 120V heater for the same reason.

Vapor Proof Light

This light is internally wired to the light switch. Only source power needs to be wired into the junction box powering the light. Maximum bulb size is 100 watts. Do not operate with globe until walk-in is at operating temperature.

Fluorescent Lights

These lights are field installed and will require both source power and internal wiring by a qualified electrician.

The above will be wired to door switch via “J” Box on interior of door section in most cases.

All installation should be in accordance with NSF and prevailing electrical code.

Warning! When installing your Walk-in cooler or freezer, always use a qualified electrician for all your wiring needs. Refer to wiring diagram included in this manual.

13

Image 15
Contents For All W. A. Brown & Son, Inc. Models Table of Contents Terminology Receiving and UncratingLayout of the Floor Floor Preparation and InstallationInstallation of floor panels Diamond Aluminum Treadplate Overlay InstructionsRamset Studs Or Screws Cam Lock InstallationFloor Spline Layout and Installation Floorless Walk-In LayoutFigure #4 PVC Panel Track Installation for Floorless Walk-InWall Protector Plate Wainscotting Instructions Wall Panel InstallationMultiple Compartment Walk-Ins With a Tee Panel Top Panel InstallationInstallation of Membrane Roof Cap For Outside Units Membrane Roof CapPenetrations of Panels Install to existing wall Duro-LastRoof Cap Installation for outside installationPainting Fiber Cement Fiber Cement Finish Panels InstallationWhen ceiling is not Top Panel Trim Installation Installation of 1/2 x 5 Trim on Top PanelsDrop-Off Walk-In Coolers and Freezers Final Checks Before Operation EZ Pack Installation InstructionsInstalling the Refrigeration System Setting ControlsFluorescent Lights Roof Cap & Curb Installation Figure #14Wiring the Door Heater, Lights & Windows Vapor Proof LightCleaning Stainless Steel Finishes Housekeeping and SafetyHousekeeping and Safety Recommendations Cleaning of Stucco Aluminum & Galvalume PlusHow To Call for Service Repair Replacement PartsSize Lifetime Limited Cabinet Warranty See sketch Adjusting Door Closer See Figure #17Instructions for removing Door Leaf with Spring Loaded Hinges See Figure #15Description Of Numbered Door Section Components Replacement KeysDescription Of Numbered Parts in Figure #19 and #20 Guidelines For Replacing Door Heater CableRelacing Door Gasket Cross Section Of Door LeafDescription Of Numbered Parts in Figure #21 Replacing Flush Dial Thermometer Installing Surface Dial Thermometer Figure #23Description Of Numbered Parts, Figure #27, and #28 Replacing The Digital ThermometerReplacing a Pressure Relief Port Description Of Numbered Parts, Figure #24 and #25Figure #26 Electrical Hook-Up to Junction BoxFigure #30 Malfunction Possible Cause Solution Refrigeration Trouble Shooting GuideInput Voltage