Brown and Son WA Cooler & Freezer manual Relacing Door Gasket, Cross Section Of Door Leaf

Page 22

Relacing Door Gasket

1.Open the door to a 90˚ angle. Using two people, lift the door leaf from the hinges and place it horizontally across two saw bucks or similar supports. (CAUTION: When removing door leaf from door section use caution not to dislodge the hinge pins.) See page 17 if this occurs.

2.Start at the bottom of the door removing the old gasket. Remove it by pulling it from the groove.

3.Lay the new gasket on the door leaf. Begin by pushing the corners in place.

4.Push the gasket into the door along the top, working from each corner toward the middle.

5.Start at the top of the door and work toward the bottom, pressing the gasket into the groove.

6.The gasket will be longer than the door leaf. Take a pair of scissors and cut the gasket off to match the length of the door leaf.

7.Slide the magnet out of the gasket and cut 1/2" to 3/4" off the magnet.

8.Push the magnet in place. Check the top corner to make sure that the gasket meets at the top.

9.Place the vinyl plug in the bottom of the gasket and glue, heat seal, or staple in place. This is to prevent the magnet from falling out.

10.Using two people, place the door back on its hinges.

11.Check the door for proper seal on all sides.

Cross Section Of Door Leaf

Description Of Numbered Parts in Figure #21

1.Magnetic door gasket (NSF approved grey)

2.PVC Door perimeter (NSF approved grey)

3.

4" Urethane foam

Figure #21

4.

Metal finish

 

20

Image 22
Contents For All W. A. Brown & Son, Inc. Models Table of Contents Receiving and Uncrating TerminologyDiamond Aluminum Treadplate Overlay Instructions Floor Preparation and InstallationInstallation of floor panels Layout of the FloorFloorless Walk-In Layout Cam Lock InstallationFloor Spline Layout and Installation Ramset Studs Or ScrewsPVC Panel Track Installation for Floorless Walk-In Figure #4Wall Panel Installation Wall Protector Plate Wainscotting InstructionsTop Panel Installation Multiple Compartment Walk-Ins With a Tee PanelMembrane Roof Cap Installation of Membrane Roof Cap For Outside UnitsPenetrations of Panels Duro-LastRoof Cap Installation for outside installation Install to existing wallFiber Cement Finish Panels Installation Painting Fiber CementWhen ceiling is not Installation of 1/2 x 5 Trim on Top Panels Top Panel Trim InstallationDrop-Off Walk-In Coolers and Freezers Setting Controls EZ Pack Installation InstructionsInstalling the Refrigeration System Final Checks Before OperationVapor Proof Light Roof Cap & Curb Installation Figure #14Wiring the Door Heater, Lights & Windows Fluorescent LightsCleaning of Stucco Aluminum & Galvalume Plus Housekeeping and SafetyHousekeeping and Safety Recommendations Cleaning Stainless Steel FinishesReplacement Parts How To Call for Service RepairSize Lifetime Limited Cabinet Warranty Loaded Hinges See Figure #15 Adjusting Door Closer See Figure #17Instructions for removing Door Leaf with Spring See sketchReplacement Keys Description Of Numbered Door Section ComponentsGuidelines For Replacing Door Heater Cable Description Of Numbered Parts in Figure #19 and #20Cross Section Of Door Leaf Relacing Door GasketDescription Of Numbered Parts in Figure #21 Installing Surface Dial Thermometer Figure #23 Replacing Flush Dial ThermometerDescription Of Numbered Parts, Figure #24 and #25 Replacing The Digital ThermometerReplacing a Pressure Relief Port Description Of Numbered Parts, Figure #27, and #28Electrical Hook-Up to Junction Box Figure #26Figure #30 Refrigeration Trouble Shooting Guide Malfunction Possible Cause SolutionInput Voltage