Vanguard Heating SDVBN(A), SDVBP(A) manual Specifications, Sdvbna Sdvbpa

Page 32

® SDVBN(A) AND SDVBP(A)

CAST IRON STOVE AND BURNER SYSTEM

SPECIFICATIONS

 

SDVBN(A)

SDVBP(A)

 

16,000-22,000 Btu/h

14,000-20,000 Btu/h

 

 

 

Gas Type

Natural

Propane/LP

 

 

 

Ignition

Piezo

Piezo

 

 

 

Manifold Pressure

3.5" w.c.

10.0" w.c.

 

 

 

Minimum Inlet Supply Pressure

4.5" w.c.

11.0" w.c.

 

 

 

Thermal Efficiency

70%

70%

 

 

 

Dimension, Inches/mm (HxWxD)

 

 

Stove and Burner System*

27" x 26 1/4" x 26 1/8"

27" x 26 1/4" x 26 1/8"

 

685.8 x 666.7 x 663.4mm

685.8 x 666.7 x 663.4mm

Carton (Insert Only)

23 1/4" x 33 1/4" x 23 1/2"

23 1/4" x 33 1/4" x 23 1/2"

 

590.5 x 844.5 x 596.9mm

590.5 x 844.5 x 596.9mm

 

 

 

Weight, lbs/kg

 

 

Burner System

70 lbs/31.8 kg

70 lbs/31.8 kg

Shipping

75 lbs/34 kg

75 lbs/34 kg

 

 

 

* When installed in Amity cast iron stove body (SCIVF Series and PSCIVF Series).

32

105499

Image 32
Contents For Your Safety For Your Safety What to do if YOU Smell GASSafety Information Sdvbna and Sdvbpa Cast Iron Stove and Burner SystemProduct Features Product IdentificationLocal Codes Glossary TermsPRE-INSTALLATION Preparation Location and Space RequirementsStove Body Assembly Lift off corrugated box enclosing stove body cratingCast Iron Stove and DIRECT-VENT Burner System Assembly Installing DIRECT-VENT Burner System Into Stove BodyInstalling Optional Blower Accessory Installing GA3700/DA3610T BlowersLocation of Vent Termination Installing Rear CoverGeneral Venting General Venting Venting Installation Installation PrecautionsInstallation Planning Installing Vent System in a ChaseInstallation for Horizontal Termination Snorkel TerminationVent Pipe Connections Horizontal Termination Configurations Horizontal VentingInstallation for Vertical Termination Flat Ceiling InstallationCathedral Ceiling Installation If area above is a room, install firestop above framed holeVertical Termination Configurations Vertical Rigid Venting Configuration Using One 90 ElbowVanguard Rigid Venting High Altitude InstallationParts Lists for Venting Kits and Components Stove DIRECT-VENT Burner System Installation Installing GAS Piping to STOVE/BURNER System LocationInstallation Items Needed Check GAS TypeChecking GAS Connections Connecting Stove Burner System to GAS SupplyPressure Testing Gas Supply Piping System Pressure Testing Burner System Gas ConnectionsInstalling Optional Wall Mount Switch GWMS2 Installing Optional Wall Mounted Thermostat GWMT1Installing Remote Receiver Receiver Terminal Wires Battery Clip Volt BatteryInstalling LOGS, Lava Rock and Glowing Embers Installing Log NoFor Your Safety Read Before Lighting Manual Lighting ProcedureOperating Stove with Burner System Lighting InstructionsOptional Remote Operation Thermostat Control OperationGhrc Series Operation Ghrct Series OperationOperating Optional Blower Accessory Pilot AssemblyInspecting Burners Operating Optional GWMT1 Wall Mounted ThermostatCleaning and Maintenance Glass DoorPilot and Burners LogsTroubleshooting Observed Problem Possible Cause Observed Problem Possible Cause Remedy Gas leak. See Warning statement Replacement Parts Technical ServiceWiring Diagram Service HintsSpecifications Sdvbna SdvbpaAccessories Illustrated Parts Breakdown Sdvbna SdvbpaParts List KEY Part Number Description QTYAmity SCIVF* Series PSCIVF* Series Indicates Color Suffix DesignationKEY Part Description QTY Warranty Information