OWNER’S MANUAL
VENTING INSTALLATION
Continued
INSTALLATION FOR HORIZONTAL TERMINATION
1.Determine the route your horizontal venting will take. Note: The location of the horizontal vent termination on the exterior wall must meet all local and national building codes and must not be easily blocked or obstructed.
WARNING: Do not recess vent terminal into a wall or siding.
Snorkel terminations are available for terminations requiring a vertical rise on the exterior of the building (see Figures 19 and 20). Snorkel kit SVKBK is also available (see page 17). Follow the same installation procedures used for standard horizontal terminations. If installing the snorkel termination below grade (base- ment applications), you must provide proper drainage to prevent water from entering the snorkel termination (see Figure 20). Do not back fill around the snorkel termination.
2.Rigid vent pipes and fittings have spe- cial
Snorkel |
12" Minimum |
Figure 19 - Snorkel Termination
Snorkel
12" Minimum
Adequate drainage
Figure 20 - Snorkel Termination with Drainage Pipe
Continued
105499 | 11 |