Kohler Thermostatic Electric Shower manual = Brown = GREEN/YELLOW N = Blue

Page 13

Feed cable into Case. Fit Earth sleeve (not supplied) and then strip insulation.

Do not twist cable cores.

Firmly connect the conductors. Do not exert strain on the terminal block.

Refit the Cover, making sure it is correctly located. Do not overtighten screws.

Caution! Handle glass cover assembly with care.

Do not use alternative screws to secure the Cover. This can cause internal damage to the appliance. Do not seal around the back of appliance.

When fitting the Cover, position the controls to correspond with the internal drive features as shown.

L = BROWN

E = GREEN/YELLOW N = BLUE

Cover Retaining

Screw

Cover

13

Image 13
Contents These instructions are to be left with the user Contents Mira Azora 9.8 kW IntroductionImportant Safety Information Page Documentation Pack Contents ChecklistMira Energise Electric Shower Fittings Installation Requirements SpecificationsPlumbing ElectricalShower Tray Electrical Installation Installation of Mira Azora Page = Brown = GREEN/YELLOW N = Blue Page Installation of Shower Fittings End Support Slidebar End 10.11 Commissioning17.18 13.14User Instructions Read the section Important Safety Information firstEco Spray ActionOnly a Competent Tradesperson should Remove the Front Cover Fault DiagnosisHigh Low or No Handset Cleaning MaintenanceRead the section Important Safety Information first Inlet Filter Cleaning/RenewingSpare Parts List Accessories Mira Azora Spare Parts ListMira Azora Spare Parts Diagram Mira Energise Shower Fittings Spare Parts List Dimensions Internal Wiring Diagram Wiring DiagramCustomer Services Mira Showers