Kenmore 5, 7 Specifications Primary Drive, STEP-UP Drive Ratio, Number of Reels, Normal Operation

Page 46

SPECIFICATIONS

PRIMARY DRIVE

PTO. 1 3/8 inch diameter, with six splines.

 

Wide Angle PTO Shaft.

 

Standard –1.64 : 1

STEP-UP DRIVE RATIO

Optional – 2.20 : 1

NUMBER OF REELS

5, 6, 7 or 9

 

 

NORMAL OPERATION

PTO Speed, Standard 540 rpm.

 

 

 

11-Gang – 45 hp.

TRACTOR POWER. Nominal.

9-Gang – 42 hp.

Note : Horsepower varies to type of turf and

7-Gang – 28 hp.

mowing conditions.

5-Gang – 20 hp.

 

 

43

Image 46
Contents Kesmac Kesmac Transportable Reel Mowers ForewordSpecifications HOOK-UP to Tractor Contents Safety Precautions Vertical Mower General SafetyMaintenance Lift Cain Adjustment Eleven Gang Mowing ProcedureIf you do not understand……….ASK Be a Qualified Operator by Safety Precautions General SafetyMaintenance Safety Before Operating the MowerDuring Maintenance Safety Alert SymbolDECALS. See Pages 5 & 6 also Page Page Operating Conditions Main and Outrigger Mainwheel BearingsTires Turf tires are not designed for use on highwaysDaily Inspection Primary Belts Daily Inspection Drive Belts and SheavesReel Drive Belts Daily Inspection PTO Shaft Tongue TubeGuards and Decals This check should be done at regular service intervalsDaily Inspection Hydraulic System To do so may result in serious personal injuryMower Transport Wheel Bearing Service Life Do not set the tractor engine RPM too high Transport Safety ChainsTransport Lowering the Reels Lifting the ReelsHydraulic Lift Operation REEL/WING Lift Sequence REEL/WING Lower SequenceHydraulic Lift Operation REEL/WING Lift Sequence Sequence Valve Setting , 9 & 11 Gang only Relief Valve Setting Lift Chain Adjustments Reels 4Lift Chains Adjustment Reels 4 and 5Cutting Height Adjusment Cutting Height Adjustment FAIRWAY. Floating Head Reel to BED Knife Adjustment Pre-single point adjustment unitsReel to BED-KNIFE Single Point Adjustment Vertical MOWER. Depth of CUT Adjustment Drive Belt AdjustmentVertical Mower Operation Hours or Weekly Routine MaintenanceHours Annual Maintenance Inspection = Grease. B = Oil LubricationGearbox Lubrication Gearbox Lubrication Main Wheel Axle Assembly . From Feb.07 Cones as assembliesMain Wheel Axle Assembly. Serial No’s 357 to February Outrigger Single Wheel. From Serial No Single Outrigger Wheel Dual Outrigger WheelsWing Kick Springs Main Drive Belts Reel Drive Belts Maintenance Maintenance PTO Shaft SET- UP Main Jackshaft Bearing replacementShafts must be set-up as illustrated Specifications Gang Gang 7-Gang 5-Gang Gang 9-GangSTEP-UP Drive Ratio Specifications Primary DriveTractor POWER. Nominal Number of ReelsBacklapping Attachment Hydraulic OperationBacklapping Operation Reel and Bedknife Sharpening Wing Frame Optional Castor Wheel Gang onlyLift Chains Attachment Points Grade 5 and 8 Fasteners. Coarse Thread Torque GuideSize Plated Plain
Related manuals
Manual 44 pages 60.15 Kb