Global Machinery Company BPB41 instruction manual Assembly, Before Use Mixing the fuel

Page 8

Assembly

IMPORTANT. Blower tube installation affects the blower’s performance. Ensure the tube is fitted correctly before every use.

WARNING. Danger from rotating impeller! Stop the engine and remove the spark plug cap before installing or removing the blower tubes. Never perform any maintenance or assembly procedures on this machine while the engine is running.

1.Place the blower upright on the ground or on a sturdy work surface.

2.Push the wide sweeper nozzle

(5) over the straight tube (4)

lining up the locking pins.

3.Rotate the nozzle tube clockwise locking it into place.

4.Push the assembled blower tube over the discharge port (17).

5.With the locking pins lined up, rotate the straight tube (4) clockwise to lock it into position.

Before Use

IMPORTANT. This machine is fitted with an impeller which runs at high speeds. Ensure this instruction manual is thoroughly read AND understood. Incorrect operation may cause serious injury.

Mixing the fuel

CAUTION. Use of pure fuel is prohibited strictly!

ENGINE FUEL: MIX AT 40:1

(40 parts unleaded fuel to 1 part 2-stroke oil)

IMPORTANT. Use good quality air cooled 2-stroke engine oil.

This product is powered by a 2-stroke engine and requires pre-mixing fuel with 2-stroke oil.

1.Use fresh unleaded petrol. You must use 100% synthetic oil specifically made for heavily stressed two-stroke engines.

2.Mix the petrol and oil in an approved container. Never mix fuel directly in the blower fuel tank.

WARNING. Never use any type of pre-mixed fuel/oil direct from fuel stations. This may include special blends intended for use in mopeds, motorcycles, etc.

3.Mix the fuel thoroughly and also each time before fuelling.

4.Always pre-mix in small quantities. Never mix quantities larger than what will be used in a 30 day period.

Note. Do not store petrol in plastic containers. Keep fuel out of the reach of children.

Note. 2 stroke fuel has a limited shelf life of approximately 3 - 4 months. To avoid possible issues with starting and running the machine, the fuel should be changed at regular intervals.

8

Image 8
Contents Petrol Backpack Blower Contents Description of symbols SpecificationsIntroduction Environmental protectionGeneral safety instructions Safety rules for petrol blowersAdditional safety rules for petrol blowers Keep fuel in a jerry can specially made for this purposeContents of carton UnpackingKnow your product Parts unleaded fuel to 1 part 2-stroke oil AssemblyBefore Use Mixing the fuel Fitting the safety straps shoulder and waist Filling the fuel tankOperation Starting the blowerStopping the blower For warm startingMaintenance Checking the spark plug Running in the engineBlowing Use of the petrol blowerStorage and maintenance after use Air filterUseful tips ServicingProblems Starting a flooded enginePage Page GMC customer assist

BPB41 specifications

Global Machinery Company has consistently been at the forefront of innovation in the heavy machinery industry, and one of its standout products is the BPB41. This advanced machine is designed to meet the rigorous demands of construction, mining, and other industrial applications, showcasing a unique blend of power, efficiency, and reliability.

One of the most significant features of the BPB41 is its robust engine, which delivers high horsepower while maintaining low fuel consumption. This efficient powertrain not only provides the necessary strength for heavy-duty tasks but also aligns with the growing global emphasis on reducing environmental impact. Advanced fuel injection systems and smart engine management technologies ensure that the BPB41 operates optimally under various load conditions, translating to cost savings for operators.

The BPB41 incorporates cutting-edge technology that enhances operational efficiency. Its integrated GPS tracking system allows for real-time monitoring of machine location and performance metrics, enabling managers to make informed decisions regarding fleet management. Additionally, the machine features an intuitive user interface, providing operators with easy access to vital information and settings. This user-centered design minimizes training time and enhances productivity on the job site.

Another remarkable characteristic of the BPB41 is its adaptability. The machine is equipped with interchangeable attachments, allowing it to perform a variety of tasks, from excavation to material handling. This versatility makes the BPB41 an essential asset for contractors looking to maximize their investment in heavy machinery. The quick-change attachment system minimizes downtime between tasks, ensuring that operators can switch gears seamlessly.

Safety is a top priority for Global Machinery Company, and the BPB41 features several built-in safety mechanisms. From advanced monitoring systems that alert operators of potential hazards to ergonomic design considerations that promote safe operation, every aspect of the machine is engineered with safety in mind.

Durability is another hallmark of the BPB41. Constructed from high-grade materials, the machine is designed to withstand the toughest job site conditions, ensuring longevity and reduced maintenance costs. The rugged design, combined with easy access to service points, simplifies routine maintenance and enhances reliability.

In summary, the Global Machinery Company BPB41 stands out as a pinnacle of modern engineering, combining power, efficiency, and safety in a versatile package. Its advanced features and technologies make it an invaluable tool for industries that require reliability and performance, solidifying its reputation in the global market.