Assembly Instructions
STEP 6 | FIG.05 |
To join the post assembly with base cabinet you will need to place the base upright on the floor and lift the post assembly and place it onto the cabinet with the burner panel facing the same side as the door. Tighten the (8) nuts and bolts at the bottom of post assembly to the top of the cabinet base. Replace valve panel utilizing step 2 in the reverse order.
HARDWARE USED
1) | P/N | |
2) | P/N | Washers Nylon (8) |
|
| (Painted Models Only) |
3)P/N
STEP 7
Hold the reducer fitting with a 15/16” wrench and tighten the hose / regulator assembly onto the reducer fitting. (See page 20 items 7 & 8)
STEP 8
Do not attach the reflector shield until all leak testing has been completed.This unit is tippable once the post assembly is fastened to the cabinet base and could damage or misshape the reflector shield prior to use.
FIG.06
2
1
3
HIGH
PRESSURE HOSE
8