Manuals
/
Brands
/
Computer Equipment
/
Power Supply
/
APC
/
Computer Equipment
/
Power Supply
APC
Power Supply manual
Please, tick the box below to download manual:
Contents
Main
Page
About this Manual
Page
Contents
Safety ......................................................................1
Site Preparation........................................................3
Installation Procedures...........................................11
Start-Up Procedure ................................................ 29
Page
Page
Safety
Overview
Cross-reference symbols used in this manual
Save these instructions
Safety symbols used in this manual
Warnings
Installation/Maintenance
Maintenance performed while the PDU is receiving input power
Total power off procedure
Register equipment with the fire department
Site Preparation
Dimensions
NetShelter VX Seismic Enclosure
InfraStruXure PDU
Site Preparation: Dimensions
NetShelter VX Enclosure
Space Considerations
Weight Considerations
Page
Electrical Requirements and Specifications
Procedures requiring a licensed electrician
Electrical requirements
Basic Installation Procedure
Page
Installation Procedures
Join Adjacent Enclosures and Bolt Enclosures to the Floor
Join adjacent enclosures Bolt Enclosures to the Floor
Page
Connect the Power Source to the PDU
Page
Install a circuit breaker
Route the input conductors to the main input circuit switch
Torque specifications and tools required
,
Connect input conductors
Connect User Contact Inputs and Output Relays to the User Connection Plate
Overview
How to connect contacts to the PDU Monitoring Unit
Install Shielding Troughs, Shielding Partitions, and Cable Ladders
Shielding Troughs and Shielding Partitions for overhead wiring along rows
Cable Ladders for overhead wiring across rows
Install InfraStruXure Rack-Mount Devices
Install the Rack Automatic Transfer Switches (ATS)
Install the Rack Power Distribution Units (PDU)
Install the InfraStruXure Manager and Hub (or Switch)
Install the APC Environmental Monitoring Unit
Route and Attach Overhead Wiring
Route and attach power cables to equipment racks
Page
Page
Wiring Under the Floor (Alternative)
,
Page
InfraStruXure Site Planning, Installation, Start-Up 27
Route Data Cables to the InfraStruXure Manager Hub (or Switch)
Configuration
RackPDU
Connect network cables to InfraStruXure components
A BOutput
Route network cables to the InfraStruXure Manager hub (or switch)
Start-Up Procedure
Apply power to the system
Page
Page
Configuration
Configure the InfraStruXure Manager
Page
Appendix ASystem Operation
How to Apply Power to the System
Page
Page
*990-1789-001*
APC Worldwide Customer Support
990-1789-001 03/2004