Installation Procedures: Route and Attach Overhead Wiring

5.From each NetShelter VX Enclosure, run the power cable of the appropriate APC power management device out the roof of the enclosure, through the notch in the rear side of the Shielding Trough, to the connector of the appropriate power cable from the PDU. Plug the two connectors together, and twist them clockwise to lock.

24

InfraStruXure Site Planning, Installation, Start-Up

Page 32
Image 32
APC Power Supply manual Installation Procedures Route and Attach Overhead Wiring