3Com 2900 manual

Models: 2900

1 62
Download 62 pages 20.43 Kb
Page 29
Image 29

Figure 3-10Connect the PGND cable to the grounding hole of switch

(1) Rear panel of the switch

(2)

Grounding sign

(3)

Grounding hole

(4)

OT terminal

(5)

PGND cable

(6)

Grounding screw

To attach the other end of the PGND cable to the grounding strip in the equipment room, follow these steps:

Step1 Cut the PGND cable to a proper length according to the distance between the switch and the grounding strip.

Step2 Peel 5 mm (0.20 in.) of insulation sheath using a wire stripper, and then insert the naked metal part through the insulation covering into the end of the OT terminal.

Step3 Secure the metal part of the cable to the OT terminal with a crimper, and then cover it with the insulation covering. Then heat the insulation covering with a blowing machine to let it completely cover the metal part.

Step4 Connect the OT terminal to the grounding pole of the grounding strip, and then fasten it with a hex nut.

Figure 3-11Connect the PGND cable to the grounding strip

(1)

Grounding post

(2)

Grounding strip

(3)

PGND cable

(4)

Hex nut

3-7

Page 29
Image 29
3Com 2900 manual