13.0Boot Placement for 900 micron Fiber

13.1Remove connector from the load adapter and slide the

boot over connector until fully seated.

IMPORTANT: Remove connector gently so that you don’t break the fiber. If connector sticks to the sides of the load adapter when trying to remove, re-heat the connector slightly until connector can be removed from the load adapter. Use the cleaning pin furnished in the kit to scrape the adhesive out of the load adapter hole before proceeding with next connector.

14.0Crimping and Boot Placement for 1.6 – 2.0 mm Jacketed Fiber

14.1Slide crimp/shrink tube down and over aramid yarn.

14.2 Remove the connector from the load adapter.