19.8Leaving polishing jig assembly positioned on the lapping film rotate 180 degrees. Perform 4 additional figure eights.

19.9Once polishing is complete , refer to steps 17.14 through 17.17 on inspecting the connector with the 200X fiber view scope before proceeding to final step.

20.0Finishing

20.1If connector is not to be immediately put into service,

install the protective dust cap.

21.0Installing Duplex Yokes

21.1Duplex yokes may be mounted after connector has

been terminated.

21.2With the anti-snag clip facing connector press cable into slot on the duplex yoke and then slide the yoke up and over the boot.

24

78-8135-4385-3-A

Page 24
Image 24
3M 78-8135-4385-3-A manual Finishing, Installing Duplex Yokes