drop out first followed by stages three, two and one. To achieve maximum efficiency, stages will reignite if the system water temperature drops below the stage Set Point minus the Set Point Differential.
Note: Once a stage is satisfied, the blower associated with that stage will allow a 25 second postpurge before it deactivates.
11.Once all of the stages have been satisfied, the pump will run for the programmed
12.The control now enters the idle state. This is indicated on the display by the "Standby" LED. The control will continue to monitor temperature and the state of other system devices. If the water temperature at the designated system controller drops below the
PREVENTATIVE MAINTENANCE
These boilers are designed to give many years of efficient and satisfactory service when properly operated and maintained. To assure continued good performance, the following recommendations are made.
The area around the unit should be kept clean and free from lint and debris. Sweeping the floor around the boiler should be done carefully. This will reduce the dust and dirt which may enter the burner and heat exchanger, causing improper combustion and sooting.
MAIN BURNERS
Check main burners every three months for proper flame characteristics.
The main burner should display the following characteristics:
•Provide complete combustion of gas.
•Cause rapid ignition and carry over of flame across entire burner.
•Give reasonably quiet operation during initial ignition, operation and extinction.
•Cause no excessive lifting of flame from burner ports (see Figure 17).
If the preceding burner characteristics are not evident, check for accumulation of lint or other foreign material that restricts or blocks the air openings to the burner or boiler.
NOTE: Cleaning of main burners.
Shut off all gas and electricity to unit.
1.Remove main burners from unit.
2.Check that burner venturi and ports are free of foreign matter.
3.Clean burners with bristle brush and/or vacuum cleaner. DO NOT distort burner ports.
4.Reinstall burners in unit. Ensure that all the screws on the burner flange are tightened securely so that the gasket will provide a good seal. Also, ensure that each orifice is centered with the venturi opening of every burner. The washer of the orifice must be inserted a minimum of 1/4" into the burner tube. This is critical for proper operation. See Figure 18.
5.Also check for good flow of combustion and ventilating air to the unit.
This is a powered burner and the flame is not supposed to be on the burner. The flame should be just above the burner deck approximately 1/8” and blue in color (see Figure 17).
Visually check flame characteristics through the view port located under the
Figure 18. Orifice Insertion
After placing the boiler in operation, check the ignition system safety
For installations above 4,500 feet (1350 m), refer to HIGH ALTITUDE INSTALLATIONS in the installation section.
THE FLOW OF COMBUSTION AIR TO THE BOILER MUST NOT BE OBSTRUCTED.
THE BOILER AREA MUST BE KEPT CLEAR AND FREE FROM COMBUSTIBLE MATERIALS, GASOLINEAND OTHER FLAMMABLE VAPORS AND LIQUIDS.
Figure 17. Normal Flame Characteristics | Any safety devices including low water cutoffs used in conjunction |
31