A.O. Smith fps50, FPSE50, FPS40 VENTING INSTALLATION cant, Exterior, Clearances, Water Products Co

Models: FPS 75 FPSE50 FPS40 fps50

1 103
Download 103 pages 20.94 Kb
Page 9
Image 9
Exterior

FPS/FPSE/FPD TECHNICAL TRAINING AND SERVICE WORKBOOK

VENTING INSTALLATION cant.

Exterior

Exterior installation clearance requirements

are crucial and must be met to ensure

Clearances:

compliance with all safety and code requirements. If all clearances cannot be

FPD

met, do not unpack the heater.

 

 

All exterior clearance requirements for the FPO are measured from the vent

 

termination.

 

 

Min. clearances for side wall venting:

Min. clearances for vertical:

 

Inside corner - 3'

l'above or 4'to the side of any

 

Side of door or window - 9"

gable, dormer, roof structure

 

Above door of window - 9"

with building interior access.

 

Above public walkway - 7'

l'above snow level.

 

Above ground or snow level -1'

 

 

Air intake to a living space - 3'above if air intake is within 10'

@1995

 

Technical Information

A.D. Smith

8

Water Products Co.

IrvinQ. Texas

Page 9
Image 9
A.O. Smith fps50, FPSE50, FPS40, FPS 75 manual VENTING INSTALLATION cant, Exterior, Clearances, Water Products Co