The Discharge Pipe
General Safety
Must not be plugged or blocked
a. DO NOT cover the temperature-pressure relief valve
General Safety cont’d
ILY INJURY, OR PROPERTY DAMAGE
Table of Contents
Introduction
Preparing for the New Installation
MANUAL BEFORE ATTEMPTING TO INSTALL OR OPERATE THE WATER HEATER
Abbreviations Found In This Instruction Manual
Some models are equipped with circulating loop fittings
Typical Installation
Facts to Consider About the Location
Locating the New Water Heater
Facts to Consider About the Location cont’d
Locating the New Water Heater cont’d
Combustion Air and Ventilation
Venting Through Roof - Clearances
Locating the New Water Heater cont’d
Figure 3a
Figure 3b
b. ALL AIR FROM OUTDOORS see Figures
Locating the New Water Heater cont’d
Water Piping
Installing the New Water Heater
Temperature-Pressure Relief Valve
Installing the New Water Heater cont’d
the temperature-pressure relief valve, and the discharge pipe
RELIEF VALVE OPENING
Filling the Water Heater
Wiring
Installing the New Water Heater cont’d
OPTIONAL Field Installed Wiring
Installing the New Water Heater cont’d
Wiring cont’d
OPTIONAL Field Installed Wiring cont’d
WIRING DIAGRAM
Installing the New Water Heater cont’d
Venting
VENTING THROUGH AN OUTSIDE WALL
See rating plate for BTU/HR rating
Installing the New Water Heater cont’d
Venting cont’d
VENTING THROUGH AN OUTSIDE WALL cont’d
4″ PVC, ABS or CPVC Schedule 40 vent piping
The vent piping may be installed as follows
Installing the New Water Heater cont’d
VENTING SYSTEM EXAMPLE INSTALLATIONS FOR ALL MODELS
NOTE See pages 21 and 22 for vertical venting through a roof
Venting cont’d
Installing the New Water Heater cont’d
VENTING THROUGH AN OUTSIDE WALL cont’d
40 AND 50 GALLON 40,000 BTU/HR MODELS 3″ VENT
Cementing PVC, ABS or CPVC Pipe and Fittings
Installing the New Water Heater cont’d
3″ DIA. VENT
NUMBER OF
CUTTING OPENING THROUGH AN OUTSIDE WALL AND COLLAR INSTALLATION
Installing the New Water Heater cont’d
INSTALLATION SHOWING USE OF PVC, ABS OR CPVC PIPE
CONNECTING VENT TO BLOWER
VENTING THROUGH A ROOF ALL MODELS
Installing the New Water Heater cont’d
3″ PVC, ABS or CPVC Schedule 40 vent piping
4″ PVC, ABS or CPVC Schedule 40 vent piping
Installing the New Water Heater cont’d
Gas Piping
VENTING THROUGH A ROOF cont’d
3″ DIA. VENT
GAS PIPING WITH FLEXIBLE CONNECTOR
Installing the New Water Heater cont’d
GAS PIPING WITH ALL BLACK IRON PIPE TO GAS CONTROL
SEDIMENT TRAP
Installing the New Water Heater cont’d
Installation Checklist
BEFORE OPERATING THE HEATER
MODEL RATING PLATE
BEFORE THE WATER HEATER WILL OPERATE
Operating
75 GALLON 70,000 AND 75,000 BTU/HR
OPERATION
THIS WATER HEATER. FOR YOUR SAFETY IF YOU SMELL GAS
Operating cont’d
Make sure gas and electric power are connected properly
AN ODORANT IS ADDED TO THE GAS USED BY
WARNING TURN OFF ALL ELECTRIC POWER BEFORE SERVICING
FOR YOUR SAFETY READ BEFORE OPERATING
Operating cont’d
OPERATING INSTRUCTIONS
Temperature Regulation
Start Up Conditions
For Your Information
Operational Conditions
VENTING MANUAL RESET SWITCH
For Your Information cont’d
SMELLY WATER cont’d
“AIR” IN HOT WATER FAUCET’S
Burner Cleaning
Periodic Maintenance
Venting System Inspection
Burner Inspection
Temperature-Pressure Relief Valve Operation
Periodic Maintenance cont’d
Housekeeping
Anode Rod Inspection
Service
Drain Valve Washer Replacement
Draining
Periodic Maintenance cont’d
faucet before turning “ON” gas to the water heater
Leakage Checkpoints
THERMOSTAT AND GAS SUPPLY CHECK
Troubleshooting
SYSTEMS CHECK
Troubleshooting cont’d
PROBLEM
Troubleshooting cont’d
SOLUTION
Thermostat problems
Blower/Draft Hood Assembly for 40,000 Btu/Hr Models Only
Repair Parts
PVC, ABS or CPVC items for all models supplied locally
THIS IS A REPAIR PARTS LIST, NOT A PACKING LIST
Repair Parts cont’d
PART