External Module Disassembly Process

NOTE: The product previews seen in the disassembly procedures may not represent the final product color or configuration.

Screw List

Step

Screw

Quantity

Part No.

 

 

 

 

Base Cover Disassembly

M2.5*5L(BNI)

6

 

 

 

 

 

2nd HDD Cover Disassembly

M2.5*5L(BNI)

1

 

 

 

 

 

WLAN Module Disassembly

M2.0*3L(BK)

1

86.ARE07.002

 

 

 

 

HDD Disassembly

M3.0*3.5L(NI)

2

86.TDY07.003

 

 

 

 

2nd HDD Disassembly

M3.0*3.5L(NI)

4

86.TDY07.003

 

 

 

 

ODD Module Disassembly

M2.0*3L(BK)

1

86.ARE07.002

 

 

 

 

External Modules Disassembly Flowchart

Turn off system and

peripherals power

Disconnect power and

signal cables from

system

Remove Battery

Remove Dummy Card

Remove Lower Cover

Remove 2nd HDD

Cover

Remove HDD

Remove DIMM

Remove WLAN Board

Remove 2nd HDD

50

Chapter 3

Page 60
Image 60
Acer 7745 manual External Module Disassembly Process, External Modules Disassembly Flowchart, Screw List Step Quantity