Machine Maintenance Procedures

Introduction

This chapter contains general information about the notebook, a list of tools needed to perform the required maintenance and step by step procedures on how to remove and install components from the notebook computer.

General Information

The product previews seen in the following procedures may not represent the final product color or configuration. Cable paths and positioning may also differ from the actual model. During the removal and installation of components, make sure all available cable channels and clips are used and that the cables are installed in the same position.

All prerequisites must be performed prior to performing maintenance.

Recommended Equipment

The following tools are required to perform maintenance on the notebook: Wrist grounding strap and conductive mat

Flat screwdriver Philips screwdriver

Screw Name

M2.0x3.0

M2.0x4.0 Ni

M2.0x2.5 Ni

Quantity

12

6

3

Machine Maintenance Procedures

3-3

Page 103
Image 103
Acer XE.H6RPN.006 manual Recommended Equipment, Screw Name, Quantity