Step 4 Replace the front panel onto the server.

Step 5 Plug an Ethernet cable to the LAN port located on the rear panel, and then connect it to your switch or router.

Step 6 Plug the AC power adapter to the power connector located on the rear panel, and connect it to a power outlet.

Step 7 Press the power button to turn on the 2-Bay NAS. Verify the

Power, HDD and LAN are lit. The HDD LED only lit up when the hard drive is properly installed.

Congratulations! The hard drive installation is complete!

6

Page 6
Image 6
Airlink101 ANAS550 user manual Congratulations! The hard drive installation is complete