NOTE: During coin slide installation, make sure activation lever is up and off the switch. Refer to Figure 38.

1

TLW209

TLW2090N

Figure 38

6.Check to make sure coin slide is operating properly by inserting coins and starting a cycle. The IN USE light will turn on, or flash if it is already on, to indicate proper operation.

NOTE: To avoid long run-down time (45 minutes factory default) when testing operation, refer to Test Setting section.

Installing Extension Onto Coin Slide:

Option 2

1.Install coin slide according to manufacturer’s instructions.

2.Insert coins into coin slide and slowly push slide in. Stop before coins fall into coin box. This will allow installing extension through meter case service door opening.

3.Install slide extension onto top of coin slide using two screws and lockwashers. Refer to Figure 37.

NOTE: Make sure extension lever is above switch activation lever.

4.Check to make sure coin slide is operating properly by inserting coins and starting a cycle. The IN USE light will turn on, or flash if it is already on, to indicate proper operation.

NOTE: To avoid long run-down time (45 minutes factory default) when testing operation, refer to Test Setting section.

32

© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT