Step 9: Connect the Washer and Dryer to Electrical Power

Refer to sections on Electrical Requirements and connect the washer and dryer to an electrical power source that can support requirements found on serial plate.

SWD730N

Figure 15

SWD731N

Figure 16

Installation

Step 10: Check Installation

Refer to Installer Checklist on the back cover and make sure that unit is installed correctly.

Moving Unit to a New Location

To prevent damage while moving the unit, the shipping materials MUST BE reinstalled.

Reinstallation of Shipping Materials

Disconnect unit from electrical supply.

Remove front access panel by removing two screws.

Place the shock sleeves on all four shock absorbers. Refer to Figure 17.

Insert hooked end of shipping brace into the open slot of the motor mount. Attach with bolts and lockwashers. Refer to Figure 17.

Reinstall front access panel.

1

4

2

3

H336I

1Shock Sleeves

2Motor Mount

3Bolts and Lockwashers

4Hooked End of Shipping Brace

Figure 17

Refer to step 6 for proper procedures whenever the unit is moved.

802031

© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT

19