Allied Telesis GS900/5E manual Power ON the end-nodes connected to the switch

Models: GS900/5E

1 40
Download 40 pages 33.63 Kb
Page 28
Image 28
7.Power ON the end-nodes connected to the switch.

Chapter 2: Installation

Warning

The power cord is used as a disconnection device. To de-energize equipment, disconnect the power cord.  E3

6.Verify that the POWER LED is green. If the LED is OFF, refer to “Troubleshooting” on page 37 for instructions.

Note

The switch perform a self-diagnostic test upon power up. This takes about 20 seconds to complete.

7.Power ON the end-nodes connected to the switch.

8.Check that all the SPD/LINK/ACT LEDs are green. If any of the LEDs are OFF, refer to “Troubleshooting” on page 37 for instructions.

The switch is now ready for use.

28

Page 28
Image 28
Allied Telesis GS900/5E manual Power ON the end-nodes connected to the switch