Allied Telesis GS900/5E manual Power ON the end-nodes connected to the switch, Installation

Models: GS900/5E

1 40
Download 40 pages 33.63 Kb
Page 34
Image 34

Chapter 2: Installation

9.Power ON the end-nodes connected to the switch.

10.Check that all the SPD/LINK/ACT LEDs are green. If any of the LEDs are OFF, refer to “Troubleshooting” on page 37 for instructions.

The switch is now ready for use.

34

Page 34
Image 34
Allied Telesis GS900/5E Power ON the end-nodes connected to the switch, The switch is now ready for use, Installation