5.Apply power to the switch by plugging the AC/DC power adapter into an AC power outlet, the plug the DC connector to the power receptacle of the switch.

Warning

The power cord is used as a disconnection device. To de-energize equipment, disconnect the power cord.  E3

6.Verify that the POWER LED is green. If the LED is OFF, refer to “Troubleshooting” on page 37 for instructions.

Note

The switch perform a self-diagnostic test upon power up. This takes about 20 seconds to complete.

7.Power ON the end-nodes connected to the switch.

8.Check that all the SPD/LINK/ACT LEDs are green. If any of the LEDs are OFF, refer to “Troubleshooting” on page 37 for instructions.

The switch is now ready for use.