American Power Conversion 480kW 400V manual Battery Monitor, Programming example

Models: 480kW 400V

1 72
Download 72 pages 33.09 Kb
Page 39
Image 39

Programming Parameters

5.3.2 Programming example

Example with four systems in parallel with separate batteries.

Programme the station addresses 1-4: 1 for UPS 1, 2 for UPS 2, 3 for UPS 3, and 4 for UPS 4.

All UPS systems have to be programmed to “Highest station address”:4.

If APM is not to be tested, “APM test mode active” must be “NO”.

If a system is isolated due to service, the station numbers must be reprogrammed for the remaining active systems starting with number 1 and ending with maximum. number of active systems. No number must be left in this sequence. Furthermore, “Highest station address” must be changed to number of active UPSs in parallel.

5.4Battery Monitor

990-4059

Installation Guide APC Silcon 480kW 400V UPS

39

Page 39
Image 39
American Power Conversion 480kW 400V manual Battery Monitor, Programming example