Appendix

9.0Appendix

9.1Table 1. Installation Planning Data

 

 

Q3

 

 

 

Service Bypass Panel

 

Main Input

Q1

Q2

Output

Breaker *

Breaker*

 

Field

UPS Module

Field

 

 

 

Wiring*

 

Wiring*

 

 

Battery Bank**

 

*Not supplied by APC

**Internal Batteries available for 40kW units and smaller

Installation Planning Data

APC Silcon Series

 

 

 

 

 

 

 

 

 

AC Input

 

 

Battery System DC

 

AC Output

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Min. Input

Input

 

Full

INom

IMax

 

Load side

Heat

Power rating

Source

P (kW)

I (A)

Cable

Overcurrent

Vn

load

Disch

Disch

In

Overcurrent

Dissipation

kW

 

kVA

 

Pf

V

Hz

Nom.

Max.

Nom.

Max.

(per phase)

Protection*

(Vdc)

P(kW)

(A)

(A)

(A)

Protection*

(kW)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

480

 

480

 

1

380

50/60

491.8

569.5

838.3

922.1

3//200mm2

1000 A

2x384

505.3

658

775

727.3

800 A

15.9

 

 

 

 

 

400

 

 

 

747.3

822.0

 

 

 

 

 

 

695.7

 

 

 

 

 

 

 

415

 

 

 

768.4

845.2

 

 

 

 

 

 

666.7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

COLUMN

 

1a

1b

1c

1d

1e

1f

1g

1h

2a

2b

2c

2d

3a

3b

4a

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTES

 

 

 

3

4

1

2

9

5, 6, 13

8

12

10

11

 

6, 7

13

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

* Provided by others

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Notes:

1.Nominal input current based on rated load.

2.Maximum input current based on rated load + full battery recharge. Full battery recharge assumed to increase input current with 10%.

3.Nominal power consumption (column 1c) based on nominal input current (1e) and the corresponding input voltage (1a).

4.Maximum power consumption (1d) based on maximum input current (1f) and the corresponding input voltage (1a).

5.Suggested input overcurrent protection (1h) based on continous full load maximum input current (1f). MCCB breaker selection based on continous full load nominal input current (1e) is acceptable, provided battery recharge time is short.

6.Fuses according to DIN LV HRC type gL, 500V assumed. MCCB load capacity must be 8xIn (nominal current) for minimum 10ms.

990-4059

70

Installation Guide APC Silcon 480kW 400V UPS

Page 70
Image 70
American Power Conversion 480kW 400V manual Appendix, Installation Planning Data