Installation

3.0Installation

3.1Requirements on Site

All system parts are accessible from front or top of UPS. Cable entries are accessible from bottom. A 1-metre free space on all sides should be allowed during installation. After installation of the UPS, leave a free space of 600 mm to the right for system access. (As per applicable national and/or local codes.)

For ventilation and service purposes allow for free space of minimum 1m above the unit or per national and/or local codes and in front of UPS. Never install systems in direct sunlight.

NOTICE!

For reliability reasons do not stand on the UPS. Keep the UPS cabinet surface free of any objects.

3.1.1 Cabinet Dimensions

UPS

Height [mm]

Width [mm]

Depth [mm]

 

 

 

 

480kW

1800

1900

800

 

 

 

 

Cabinet

1900 mm wide

1800 mm

480kW

1600 mm wide

1800 mm

APC Isolation

Transformer Module

420kW

 

990-4059

 

 

Installation Guide APC Silcon 480kW 400V UPS

5

Page 5
Image 5
American Power Conversion 480kW 400V manual Installation, Requirements on Site, Height mm Width mm Depth mm 480kW 1800 1900