Contents
Main
Page
About this Manual
Page
Contents
Safety ......................................................................1
Site Planning............................................................5
Installation Procedures ...........................................13
Start-Up Procedure ................................................ 33
Page
Page
Safety
Overview
Cross-refe rence symbols used in this ma nual
Save these instructions
Safety symbols used in this manual
War ni ng s
Receiving/moving
Installation/Maintenance
Maintenance performed while the PDU is receiving input power
Total Power Off
Emergency Power Off (EPO)
EMI
Page
Site Planning
Dimensions
NetShelter VX Enclosure
InfraStruXure PDU
Space Considerations
Weight Considerations
Heat Output
Electrical Requirements and Specifications
Procedures requiring a licensed electrician
Electrical requirements
Emergency Power Off (EPO)
PDU
Switch
UPS
Basic Installation Procedure
Page
Installation Procedures
Level the PDU and NetShelter Enclosures
Page
Page
Install a circuit breaker
Route the input conductors to the Main Input circuit breaker (or switch)
Torque specs and tools required
Connect input conductors
GL1
GEC
L3
L2
L2
Connect an Emergency Power Off Switch
Installation Procedures: Connect an Emergency Power Off Switch
Connect an EPO switch to the user connection plate and test the switch
Contact ClosureNormally Closed )
24VAC/VDCNormally Open
Note
Page
Safety warnings
Connect User Input Contacts and Relay Outputs to the User Connection Plate
How to connect contacts to the PDU Monitoring Unit
Install Shielding Troughs, Shielding Partitions, and Cable Ladders
Shielding Troughs and Shielding Partitions for overhead wiring along rows
Cable Ladders for overhead wiring across rows
Install InfraStruXure Rack-Mount Devices
Install the Rack Automatic Transfer Switches (ATS)
Install the Rack Power Distribution Units (PDU)
Install the InfraStruXure Manager and Hub (or Switch)
Install the Environmental Monitoring Unit or Environmental Management System
Route and Attach Overhead Wiring
Route and attach power cables to equipment racks
Page
Page
Wiring Under the Floor
N
G
Route Data Cables to the InfraStruXure Manager Hub (or Switch)
Start-Up Procedure
Safety warnings
Ensure that all power is off
Apply power to the system
Page
Configure the InfraStruXure Manager
Appendix A: Operation
How to Apply Power to the System
Page
Page
Page
Appendix B: Changes in This Manual