American Power Conversion 60kW InfraStruXureTM System Install InfraStruXure Rack-Mount Devices

Models: 60kW InfraStruXureTM System

1 60
Download 60 pages 33.19 Kb
Page 34
Image 34

Install InfraStruXure Rack-Mount Devices

Install the Rack Automatic Transfer Switches (ATS)

Install a Rack ATS in the top of each enclosure for overhead wiring, and in the bottom of each enclosure for wiring under the floor.

See the installation instructions in the manual included with your Rack ATS.

See also

The Rack ATS is an optional component and not all InfraStruXure systems will include them.

Install the Rack Power Distribution Units (PDU)

Install Rack PDUs in the rear of the NetShelter VX enclosure, in the channel directly behind the rear vertical mounting rails. For overhead wiring, make sure that the power cord is pointing toward the roof of the enclosure. For under the floor wiring, make sure that the power cord is pointing toward the floor.

See the installation instructions in the manual included with your Rack PDU.

See also

Install the InfraStruXure Manager and Hub (or Switch)

Install the InfraStruXure Manager in the enclosure closest to the PDU. The CAT-5 data cables included with your configuration are of varying lengths, based on the distance components will be installed from the PDU.

See the installation instructions in the manual included with your InfraStruXure Manager.

See also

Install the Environmental Monitoring Unit or Environmental Management System

The Environmental Monitoring Unit and the Environmental Management System are optional components and not all InfraStruXure systems will include them.

See the installation instructions in the manual included with the Environmental

Monitoring Unit or Environmental Management System.

See also

26

InfraStruXure System—Installation and Start-Up

Page 34
Image 34
American Power Conversion 60kW InfraStruXureTM System manual Install InfraStruXure Rack-Mount Devices