How to Install the Rack PDU
Installation guidelines | • For a Rack PDU installed in an enclosed communications rack, the  | |
  | 
  | recommended maximum ambient temperature is 45° C (113º F).  | 
  | •  | Install the Rack PDU so that it does not reduce the air flow  | 
  | 
  | required for safe operation of the equipment.  | 
  | • Install the Rack PDU so that there is an even mechanical load.  | |
  | • Follow the nameplate ratings when connecting equipment to the  | |
  | 
  | supply circuit. Avoid overloading the circuits, which could affect  | 
  | 
  | |
  | •  | Maintain reliable earthing of the Rack PDU, especially supply-  | 
  | 
  | connections that do not directly connect to the branch circuit.  | 
  | • Install the Rack PDU so that the power plug is accessible to be  | |
  | 
  | disconnected for service.  | 
Attach the cord  | Attach the cord retention tray to the Rack PDU, using four   | |
retention trays | screws (provided) per tray.  | |
  | Mount an additional cord retention tray to secure cords  | 
  | from the top bank of outlets. Purchase additional tray kits  | 
  | from APC (AP9569).  | 
  | Note  | 
Additional cord  | Attach a second cord retention tray to the PDU, with the cord retainers  | 
retention tray (optional) | facing down.  | 
Switched Rack PDU Installation and Quick Start  | 3  |