Installing the Hub continued

Installation

5 Secure the hub with the screws removed in Step 3.

procedure,

6 Using straight-through UTP cables, connect the Sta-

continued

tion ports (1X – 4X , in any order) to each worksta-

 

tion’s 10Base-Tport or to the Uplink port of a hub to

 

be connected in cascade.(See Figure 2 on page 4.)

 

7 Connect the Uplink port, if applicable:

 

If connecting to another hub:

 

– Use a straight-through cable to connect to a Sta-

 

tion port. (See Figure 2 on page 4.)

 

– Use a crossover cable to connect to the Uplink

 

port. (See Figure 4 on page 10.)

 

If connecting the Uplink port to a workstation or

 

other non-hub device:

 

– Use a crossover cable. (See Figure 2 on page 4.)

 

8 Turn on the UPS or device that now houses the hub.

 

To turn on the UPS or device, follow the appropriate

 

procedure listed below:

 

Smart-UPS

 

a Plug the UPS back into the AC power outlet.

 

b Press and hold the Power On button until you

 

hear a click and beep or until the power LED

 

illuminates.

 

c Power on the connected equipment.

 

Matrix-UPS

 

a Turn on the circuit breaker on the bottom left

 

side on the back panel of the UPS.

 

b Turn on the UPS via the front panel.

 

c Power on the connected equipment.

 

 

 

Continued on next page

8

Page 12
Image 12
American Power Conversion AP9615 manual Secure the hub with the screws removed in Step, Be connected in cascade.See on