Installing the Hub

 

continued

 

 

 

Installation

Matrix-UPS

procedure,

a

Shut down and power off the connected

continued

 

equipment.

 

 

b

Turn off the circuit breaker on the bottom left

 

 

 

side on the back panel of the UPS.

 

 

SymmetraPower Array

 

 

a

Shut down and power off the connected

 

 

 

equipment.

 

 

b

Turn off the System Enable switch on the

 

 

 

bottom left side on the back panel of the UPS.

 

 

Smart-UPS®DP

 

 

a

Shut down and power off the connected

 

 

 

equipment.

 

 

b

Turn off the ON/OFF switch on the front

 

 

 

panel.

 

 

Triple Chassis for Silcon DP300E Series UPSs

 

 

a

Shut down and power off the connected equip-

 

 

 

ment.

 

 

b

If present, unplug the Triple Chassis’s power

 

 

 

supply from the AC power outlet.

 

 

c

Disconnect the cable attached to the To UPS

 

 

 

port on the Triple Chassis.

2 Unpack the 5 Port 10Base-T Hub. The shipping materials are recyclable. Please save, reuse, or dis- pose of them appropriately.

Handle the 5 Port 10Base-T Hub by the front panel. Do not touch the exposed printed cir- cuit board or components. Touching the circuit board or components may result in damage to the hub.

Continued on next page

6

Page 10
Image 10
American Power Conversion AP9615 manual Shut down and power off the connected, Equipment, Side on the back panel of the UPS