CONTENTS

 

 

Page

Overview

 

1

Checklist

 

1

Section 1.

Unpacking/Inspection (at reseller location)

2

Main Housing Chassis and Inverter

2

Battery Inspection

2

 

Unpack Battery

2

 

Inspect Battery

2

 

Clean battery

2

 

Remove Battery from Shipping Container

2

 

Check Battery Fluid Level

2

 

Check Battery Charge Level

3

 

Repackage Battery

3

Section 2.

Unpacking/Inspection (at customer location)

3

Main Housing Chassis and Inverter

3

Battery Inspection

4

 

Unpack Battery

4

 

Inspect Battery

4

 

Clean Battery

4

 

Remove Battery from Shipping Containe

4

 

Check Battery Fluid Level

4

 

Check Battery Charge Level

4

Section 3.

Installation 1

 

Main Housing Placement

4

 

Location Selection

4

 

Lock Wheels

4

Battery Installation

4

 

Main Housing Chassis Rear Panel Removal

4

 

Install a Battery

5

 

Battery Connections

6

 

Install Main Housing Chassis Rear Panel

6

Install Inverter

6

Install Wiring Management Kit

7

Section 4.

Controls and Indicators

9

Inverter Controls

9

 

AWAY/HOME

9

 

TEST/MUTE

9

 

Circuit Breaker Switch

9

Inverter Indicators

9

Section 5.

Troubleshooting

12

Manual Bypass

12

Preventative Maintenance

13

Specifications

14

Warranty

 

15

Contact Information

15

i

Page 2
Image 2
American Power Conversion BI800T, BI800F user manual Contents