1 INSTALL ELECTRICAL BOX |
ASSEMBLY; Fig. 3 |
1. Cut a 127x127mm (5"x 5") opening in finished wall for |
ELECTRICAL BOX (1) at the deminsion shown in Fig.3. |
2. Rotate the 4 MOUNTING TABS (2) flat against the |
electrical box. Holding the MOUNTING TABS (2) in |
position install the ELECTRICAL BOX (1) into the opening. |
Make sure the MOUNTING TABS (2) are behind the wall. |
Fig.3 (TOP SPUD FIXTURE ILLUSTRATED)
127mm | 2 |
|
(5) |
|
|
127mm |
|
|
(5) |
|
|
| T O P | 3 |
Fig. 3a
3. Tighten the the 4 MOUNTING SCREWS (3) until the |
ELECTRICAL BOX (1) is almost secure in the wall. |
Before tighting fully rest a level at the top edge of the |
ELECTRICAL BOX (1) and make sure the box is level, |
then tighten fully. Fig. 3a. |
4. *Cut a 2" hole for supply to fixture at deminsion shown. |
406mm
(16 REF.)
127mm
(5 MAX.)
T O P
1
*FOR HOLE LOCATION OF
SUPPLY ON BACK INLET FIXTURES, REFER TO FIXTURE BEING INSTALLED FOR CORRECT HEIGHT FROM FINISHED FLOOR
2INSTALL SWEAT SOLDER ADAPTER; Fig. 4
CAUTION | Turn water supplies off |
before beginning |
Fig. 4
T O P | 2 |
| 1 |
Note: Control stop inlet is 1" IPS. For optional sweat
connection, install Sweat Solder Adapter (1) (Supplied) for 1" copper pipe supply line. Fig. 4.
1.Clean the end of the supply pipe. Push the threaded ADAPTER (1) on until it is seated against the internal stop. Sweat the ADAPTER (1) to the pipe.
2.From behind the wall install the CONTROL STOP (2) to the water supply line with the outlet positioned as required.
3.Support piping as required.
CONTROL
STOP
OUTLET
FILE | CONTROL STOP | |
DN 25mm | ||
EDGES | ||
(1" I.P.S.) | ||
|
CLEAN & SOLDER
TO ADAPTER (1)
2
403 TO 441mm
3FLUSH OUT SUPPLY LINES; Fig. 5
1.Open SUPPLY STOP (1).
3.Turn on water supply to flush line of any debris or sediment.
4.Close SUPPLY STOP (1) and turn off water supply line.
Fig. 5
CLOCKWISE CLOSES | |
OPENS CONTROL STOP | CONTROL STOP |
1
3
M968550 REV. 1.5