Installation steps

Warning: After installation, it is strongly recommended that you fully test your configuration before putting it into a production environment.

1.Make all connections to the Dry Contact I/O SmartSlot Card to support your configuration before continuing. See “Itemizing the input contact and output relay terminal blocks” on page 6 for information on making the connections.

Electrostatic discharge: The Dry Contact I/O SmartSlot Card is sensitive to static electricity. Handle the Card by the end plate only. Do not touch the exposed printed circuit board.

2.Use a #2 Phillips-head screwdriver to remove the two screws retaining the slot cover on the host device. Keep the screws for use later. Keep the slot cover for future use.

12

Dry Contact I/O SmartSlot Card

Page 16
Image 16
APC AP9613, AP9810 manual Installation steps