Ariens 24 LE (920014 s/n 100000 & up) quick start Step Three Install Discharge Chute Crank

Models: 24 LE (920014 s/n 100000 & up)

1 30
Download 30 pages 56.81 Kb
Page 10
Image 10

Step Three: Install

Discharge Chute Crank

1.Remove gear cover from top of chute pedestal.

2.Slide Chute Crank through the nylon bushing in the support bracket under control panel.

NOTE: Be careful not to damage nylon bushing when attaching crank to the control panel.

3.Connect the chute crank to the pinion gear on discharge chute with spring clip pin.

4.Replace gear cover on top of chute pedestal.

5.Orient the chute and pedestal to its most vertical position and tighten pedestal hardware to 14.8-31.0 lbf-ft (20-42 N∙m).

Page 10
Image 10
Ariens 24 LE (920014 s/n 100000 & up) quick start Step Three Install Discharge Chute Crank