Arrow Plastic HM108-A, SA108-A, NW108-A, PD108-A, NP108 Ridge Caps & Panels, Step, Parts Needed For

Models: VN108-A MN108-A NP108 HM108-A EN108-A PD108-A NW108-A SA108-A

1 32
Download 32 pages 43.23 Kb
Page 28
Image 28
Ridge Caps & Panels

 

Step 15

Parts Needed For

8840 Ridge Cap (1)

 

 

7483 Roof Panel (2)

 

 

Ridge Caps & Panels

 

 

8486 Ridge Cap (1)

 

 

A28

 

 

 

 

 

 

 

 

 

 

 

 

 

1 Install the first ridge cap on the completed roof section using bolts and nuts. Fasten roof panel overlaps not used for ridge cap. Cover the head of bolt with the 2" (5 cm) piece of weather stripping tape. Do not fasten the ends of the ridge cap at this time.

2 Install the second ridge cap over- lapping the first ridge cap while in- stalling the remaining narrow roof panels. Continue weather stripping the ridge.

3 Fasten the lower end of the panels

to the side wall angles using screws and washers. Use bolts and nuts through wall angle overlaps at the bottom of the panel.

Cut Weather

Stripping and

Fold Under

7483

28

STEP

1

8486

8840

Strips

STEP

2

7483

STEP

3

Page 28
Image 28
Arrow Plastic HM108-A, SA108-A, NW108-A, PD108-A, EN108-A, NP108, MN108-A, VN108-A Ridge Caps & Panels, Step, Parts Needed For