The items required for the optional configurations described in this chapter are not included in the standard barebone system package. These items are purchased separately.

3.1 Preparing the system for rack mounting

3.1.1 Removing the footpads or roller wheels

Refer to section “2.10.7 Chassis footpads and roller wheels” for instructions on removing the footpads or roller wheels.

3.1.2 Removing the top cover

To remove the top cover:

1.Remove the chassis cover. Refer to section “2.1.1 Removing the side cover.”

2.Remove the front panel assembly. Refer to section “2.5.1 Removing the front panel assembly.

3.Carefully slide out protruding portion of the top cover as shown.4.Locate two round mylars on top cover.

5.Carefully remove each mylar using a sharp, flat object such as the edge of a cutter.

3.1.3 Attaching the rack rails

Refer to the installation guide that came with the Rackmount Rail Kit for instructions on how to attach the rails and on the barebone server system and the corresponding rails on the industrial rack.

3-

Chapter 3: Installation option