Installation
To set up a daisy chained installation, do the following:
1.Make sure that power to all the devices you will be connecting up has been turned off.
2.Use a daisy chain cable set (described in the Cables section, p.
3.Use KVM cable sets (described in the Cables section, p.
4.Repeat the above steps for any additional Master View units you wish to add to the chain.
5.Power up the installation according to the following procedure:
a)Plug in the power adapter for the First Station.
Wait a few seconds for the unit to ascertain its Station ID.
b)Plug in the power adapters for each Station on the installation in turn (Second Station, then Third Station, etc.).
Each
In each case, wait for the Station ID to be ascertained and displayed on the Station ID LED before plugging in the next Station.
c)After all the Stations are up, power on the computers.