16

Step 16

Main Burner Assembly

A. Slide the burner tubes down through the indicated holes in the bowl and align the holes in the burner brackets with the holes in the Bowl. Verify that the valve nozzles are inserted in the ends of the burner tubes. (See Detail)

B. From underneath the Bowl, verify that the valve nozzles are inserted in the ends of the burner tubes. Fasten the Main Burner to the Bowl with 2) #5 x .31” Tapping Screws.

Detail

Burner Valve

Tube Nozzle

A

B

#5 x .31” Tapping Screw

2 pcs.

Page 16
Image 16
Aussie 6112S8X641, 6122S8X641 manual Step Main Burner Assembly