PAGE 30 OPTIONAL EQUIPMENT (CONTINUED)
Propane Conversion Kit (Part # 98900746)
The propane conversion kit should be installed prior to installing the heater (if not, shut off gas and disconnect the heater from the gas line).
Items Needed For Assembly
¥ 1/4" Nutdriver | ¥ 7/16" and 1/2" Open End Wrench | ¥ Standard Screwdriver |
¥ Phillips Screwdriver | ¥ Micro (1/16") Standard Screwdriver |
|
¥ Thread sealant | ¥ Leak Testing Equipment |
|
Packing List |
|
|
¥LP Orifice (#49 - stamped "49")
¥Two Replacement Screws
¥ LP Pilot Orifice (.016" dia. - stamped "16LP") | ¥ Replacement Regulator |
¥ Regulator Gasket | ¥ LP Label |
Installation Instructions
1Remove the door (see page 14).
2Reach into the firebox and remove the rear log shelf (see the illustration below).
The rear log shelf slides on and off the burner pan assembly
Rear
Log
Shelf
Make sure the two tabs slide over the side of the burner pan on both sides.
Burner Pan
Assembly
NOTE: When installed, the log shelf must maintain a parallel 3/8Ó gap to the burner pan.
Position the shelf so the back edges of the shelf and burner pan are flush.