16 Stove Installation (for qualified installers only)
© Travis Industries 100-01190_000 4070326

Standard Ceiling

with a Factory

Built Chimney

Chimney Cap
(See the section "Chimney
Termination Requirements"
for more details)
Chimney Sections
Minimum Air Space to
Combustibles (See
Chimney Manufacturer's
Instructions - usually 2")
Chimney Connector Sections
Follow the chimney
manufacturer's instructions
and clearances for roof
penetrations. A storm collar
and flashing are required
(some require a radiation
shield).
}
}
Minimum 15'
Maximum 33'
Stove Clearances
(See the section "Stove
Placement Requirements"
for more details)
Floor Protection
(See the section "Floor
Protection Requirements"
for more details)
Follow the chimney
manufacturer's instructions
and clearances for floor
penetrations. A ceiling
support is required, an attic
insulation shield is required
where insulation is present.
Insulation
Figure 13

Cathedral Ceiling

with a Factory

Built Chimney

Chimney Cap
(See the section "Chimney
Termination Requirements"
for more details)
Chimney Sections
Minimum Air Space to
Combustibles (See Chimney
Manufacturer's Instructions -
usually 2")
Follow the chimney
manufacturer's instructions
and clearances for roof
penetrations. A storm
collar, flashing, and
cathedral-style chimney
support are required
(some require a radiation
shield).
}
Minimum 15'
Maximum 33'
Stove Clearances
(See the section "Stove
Placement Requirements"
for more details)
Floor Protection
(See the section "Floor
Protection Requirements"
for more details)
Chimney
Connector
Sections
Figure 14