Barco R9002327 A Horizontal scan inversion, B Vertical scan inversion, Installation Set Up

Models: R9002327 R9002328

1 55
Download 55 pages 18.13 Kb
Page 25
Image 25
A : Horizontal scan inversion

INSTALLATION SET UP

INSTALLATION SET UP

A : Horizontal scan inversion

Three connectors are used, one for each horizontal deflection coil. When changing

B : Vertical scan inversion

the horizontal scan, insure that all three connectors are set in the same position. See position of the connectors)URQWfor￿￿￿7DEOHthe corresponding)URQW￿￿￿&HLOLQJprojector5HDU￿￿￿7DEOHconfiguration5HDU￿￿￿.&HLOLQJ

Three connectors are used, one for each vertical deflection coil. When changing the vertical scan, insure that all three connectors are set in the same position. See position of the connectors for the corresponding projector configuration.

Top view of the connectors; upper three connectors for horizontal scan inversion, lower three for vertical scan inversion.

Horizontal scan connectors

Vertical scan connectors

C : Convergence&RQWDFW￿VLGHconnectors

Three connectors are used. The position of these connec- tors has to be changed when switching from one configu- ration to another.

With an open chassis, for a front-tableor a rear ceiling configuration, the connectors must be plugged in with the contacts upwards (away from the tubes). For a front- ceiling or rear-tableconfiguration, the connectors must

be plugged in with the contacts facing the tubes

4-6

 

5975069ABARCOVISION708200498

 

Page 25
Image 25
Barco R9002327 A Horizontal scan inversion, B Vertical scan inversion, be plugged in with the contacts facing the tubes