Installation Setup

Power ON switch

The ON/OFF switch A is located on the right side of the Rugged Remote Control near the DC power plug (image 3).

Remark: The Remote Control can also be supplied with the charger permanently connected.

A

image 3

Supplying the Wireless Base

The wireless base is supplied via the projector.

The connection needs a standard serial cable linking the 'COMM PORT' of the projector to the 'COMM PORT' of the Wireless Base.

The supplied3&0257voltage depends on the&200type of￿3257projector.

15

Page 15
Image 15
Barco R9840171, R9840170, R9840176 manual Installation Setup Power on switch, Supplying the Wireless Base